Back

EPA Region 4 Press Release. ERH is underway at CTS Asheville, NC Superfund site

06-08-2018

Treatment is underway to clean up contaminants in the groundwater and soil at the CTS of Asheville, Inc. Superfund Site (Site). Electrical Resistance Heating (ERH) is being used to treat a 1.2-acre area beneath the former CTS plant. The system will operate through the fall of 2018 designed to extract 95 percent of the trichloroethene (TCE) in the treatment area, removing an estimated 20,000 pounds of pollutants.

Read More (127 KB PDF)...

Top